2010 Load Control Details
The deadline for the 2010 program was March 10
| CONTROL | OPTION 1 |
|---|---|
| Discount | 5.5% of Total Annual Bill |
| Dates | May 12 - May 31 June 21 - June 30 Sept 1 - Setp 10 |
| Periods | Two 15-hour periods in every Six Days |
| Times | 7:00 AM - 10:00 PM |
| Avg Events last 10 years (Sample Data) | 1.8 per Month 5.3 per Year |
| Avg Hours Last 10 Years (Sample Data) | 19.5 per Month 58.5 per Year |
| CONTROL | OPTION 2 |
|---|---|
| Discount | 8.8% of Total Annual Bill |
| Dates | May 12 - May 31 June 21 - June 30 Sept 1 - Setp 10 |
| Periods | One 15-hour period in every Two Days |
| Times | 7:00 AM - 10:00 PM |
| Avg Events last 10 years (Sample Data) | 2.7 per Month 8.1 per Year |
| Avg Hours Last 10 Years (Sample Data) | 28.0 per Month 84.0 per Year |
YEWA will accept up to 125 additional wells on the Load Control Program this year. Existing wells that were on the program previously may stay on the program or reactivate if they had been removed from the program during a previous year without counting against the 125 additional well limit
No bypass of the load control equipment will be allowed. There will not be any exceptions made for any reason, and there will not be any buy-through option available.
Controlled interruptions are only those which occur under the program. Other interruptions in service may occur due to emergency conditions, equipment failure, or other conditions requiring interruption of service for the operation or maintenance of Y-WEA's system. These other interruptions are not considered in calculating any program discounts or time limits.
To check the status of a load group, call
1-866-I-NEED-YW or
1-866-463-3399.







